The buildings will be located in the north-east part of the student village. The construction project is estimated to be completed in January 2028.
Construction of the new buildings
We will construct one building on the site between Olav M. Troviks vei 8-10, 12-14 and 18. This building is scheduled for completion in August 2027. We will also construct two buildings on the site by Olav M. Troviks vei 2-4, 6 and 8-10. These are scheduled for completion in January 2028. During the construction project, we will open a new underground car park in one of the new buildings.
Drilling of energy wells
We will drill energy wells at each of the three new buildings. Progress depends on ground conditions. The drilling will cause significant noise.
Consequences
The construction project will result in periods of significant noise and dust. There will be traffic to and from the construction sites. Access may be reduced at times, but it will always be possible to reach all buildings. There will also be light from tower cranes.
There will be short periods without water and power when the new buildings are connected to the existing water supply and electricity grid. These will be announced in advance.
Construction works on saturdays
From November 2026 to March 2027, work will take place on Saturdays at the construction site by Olav M. Troviks vei 2-4, 6 and 8-10. This is necessary to keep the project on schedule after approval was granted to add an extra floor to one of the new buildings.
We will do our best to limit noise and avoid carrying out the noisiest activities on Saturdays. In November and December, Saturday work will include concrete works, installing and dismantling formwork, installing steel structures and insulation, and using cranes to move materials and carry out site clean-up. From January to March, work will mainly involve less noisy activities such as site tidying and lifting materials and equipment into the buildings.
Working hours
Working hours are Monday - Friday between 07:00 and 17:00, and Saturdays from 08:00 to 15:00. Noisy works outside these hours, and particularly noisy activities, will be notified separately in advance.